WATER TREATMENT PLANT

DUSTLESS BLASTING® CASE STUDY

PROJECT OVERVIEW


Pro Blasting of South Florida and Surface Prep Pros, LLC collaborated in our Private Facebook Contractor Group before teaming up to tackle an industrial-scale water treatment plant project. 

The plant needed:

  1. old coatings and rust stripped from their tanks and pipelines
  2. application of new, approved coatings

The team opted for DUSTLESS BLASTING® - the perfect method to tackle the project with minimal environmental impact. By utilizing this innovative technique, the team effectively stripped old coatings and rust from the tanks and pipelines, while keeping the surrounding grounds and open water tanks free from contamination.

JOB DETAILS


JOB LENGTH
10 weeks total

BLAST NOZZLE TYPE
#6 XL

OTHER TOOLS
(2) Boom lift
High reach forklift

MEDIA & PRESSURE
40/70 CG @ 125 PSI

BLASTING METHOD
80% wet 20% dry

THE RESULTS


Thanks to the remarkable efficiency and speed of DUSTLESS BLASTING®, this crew was able to complete the daunting task of stripping and painting a massive water treatment facility within their 10-week project timeline.

 

BEFORE AFTER WIDE